Derek S. Hines Bridge Replacement

​Barletta Heavy Division, Inc. and Massachusetts Department of Transportation (MassDOT)

Amesbury, MA

Vehicles, water traffic, and history converge at the Hines Bridge. That’s why MassDOT turned to VHB for the bridge needed to be replaced—we know how to navigate complex transportation projects while still maintaining mobility. From obtaining the necessary permits to coordinating with local organizations and regulatory agencies, the VHB team helped MassDOT complete the project seven months ahead of schedule so that all modes can continue to move about freely.   ​​

 

 

Market

​State DOTs​​​​​​​​​​


Services

Alternative Delivery 

Bridge Design & Engineering

Highway/Roadway Design & Engineering

Permitting: federal, state, local

Regulatory Agency Coordination

Public Outreach

 

 


Legal Notice | Contact Us

For special assistance for persons with disabilities or limited English proficiency, click here.

​​

© 2019 / VHB®, Vanasse Hangen Brustlin, Inc.® and
Vanasse Hangen Brustlin SM All Rights Reserved

Skip Navigation LinksDerek-S-Hines-Bridge-Replacement Derek S. Hines Bridge Replacement